Engineering is the product

Before any equipment is supplied, the system is calculated, drawn and checked. These are the disciplines behind every project.

Deliverables register

Deliverables register

Before any equipment is supplied, the system is calculated, drawn and checked. These are the disciplines behind every project.

Ref.DisciplineOutput
FP-01Fire Protection DesignDesign basis & layouts
FP-02Hydraulic CalculationsNode-by-node calculation report
FP-03Fire Pump SizingDuty point & pump curve check
FP-04Sprinkler DesignHazard class, density, head layout
FP-05Hydrant Network DesignRing main, hydrant spacing
FA-01Fire Alarm DesignDevice layout, loops, battery calc
CA-01Clean Agent CalculationsAgent quantity, nozzles, venting
SC-01CCTV DesignDORI targets, storage, bandwidth
SC-02Access Control DesignDoor schedule & access levels
IN-01System IntegrationCause-and-effect matrix, interfaces
DW-01Shop DrawingsCoordinated installation drawings
DW-02As-Built DrawingsRecord of what was installed
TC-01Testing & CommissioningTest sheets & handover file
FP-02

Hydraulic calculations

Every sprinkler and hydrant network is calculated node by node, from the most remote head back to the pump, so the water supply is proven on paper before it is built.

Q = K √PQ L/min · K L/min/bar½ · P bar
p = 6.05×10⁵ · Q¹·⁸⁵ / (C¹·⁸⁵ · d⁴·⁸⁷)Hazen–Williams · p bar/m · d mm
FP-03

Fire pump sizing

Pumps are selected so the system demand sits on the curve with margin, and the curve meets the churn and overload limits of NFPA 20.

CA-01

Clean agent quantity

A first estimate of HFC-227ea (FM-200) for a total-flooding enclosure. Change the room to see the effect.

W = (V / s) · C / (100 − C)s = 0.1269 + 0.000513 · T (m³/kg, T °C)

Indicative only. Final quantities follow NFPA 2001 / ISO 14520, the manufacturer’s flow calculation, altitude correction and an enclosure integrity test.

FA-01

Fire alarm design

Addressable loops are wired as Class A with short-circuit isolators, so a single fault never takes out more than one section of the building.

SC-01

CCTV design

Cameras are placed by the pixel density each zone needs, not by count. Every zone gets a DORI target per IEC 62676-4.

SC-02

Access control design

Every controlled door is scheduled: reader, lock, exit device and how it behaves on fire alarm.

DoorReaderLockOn fire alarm
D-G-01
Main entrance
Card + faceMaglockRelease
D-01-04
Server room
Card + PINElectric strikeFree egress only
D-B-02
Stair door
CardMaglockRelease
DW-01 / DW-02

Drawings & handover

Drawings move through defined revisions, and the as-built set records exactly what was installed.

DESIGNDesign drawingsREV A
SHOPShop drawingsREV B
AS-BUILTAs-built drawingsREV 0
O&MO&M manual & test recordsFINAL