Clean Agent Fire Suppression

Total-flooding suppression for rooms where water would do more damage than the fire: data, electrical and control spaces.

03System scope

Clean Agent / FM-200

Design references

NFPA 2001ISO 14520NFPA 12

These references describe the design basis. They are not a claim of certification, approval or listing.

  • 01FM-200 (HFC-227ea)
  • 02Clean Agent Systems
  • 03Inert Gas Systems
  • 04CO₂ Systems (where applicable)
  • 05Server Room Protection
  • 06Data Center Protection
  • 07Electrical Room Protection
  • 08Control Room Protection
  • 09Total Flooding Systems
  • 10Detection & Release Systems

How we engineer it

From concept to commissioning

Ten stages, each with a defined deliverable, so you always know what has been checked and what comes next.

01

Survey & risk review

Hazards, occupancy, existing services and authority requirements are recorded on site.

02

Design & calculation

Layouts and calculations are prepared and coordinated with the other trades.

03

Supply & installation

Approved equipment is installed to shop drawings under supervision.

04

Test, commission & maintain

Every function is tested and handed over with records and a service plan.

Have drawings ready?

Send your drawings for an engineering review and quotation.